4.As for the motor plan recommended by Mr. Wang and confirmed by us, our company can install the combination of the motor and the gearbox for mass production as long as XYTE provides the 3D model and the 2D drawings for us to review the coordination and design assembly plans. The motor should be sent to our company, installed together with the gearbox produced by our company, and then sent to XYTE for acceptance. We require XYTE to provide inspection tools to check the working condition of the motor if it is shipped in this state.
有没有更好的方式说明?